Data sources and methods
Sources for network disclosures, historical interruptions, solar installations and national electricity figures.
Commerce Commission electricity distributor disclosuresCommerce Commission copyright policy
Crown copyright under CC BY 4.0 unless otherwise stated. Disclosure years end on 31 March. Money values are in nominal New Zealand dollars.
Data refresh
- Last successful refresh
- Latest attempt
success
Datasets
Yearly electricity disclosures
Commerce Commission data page for Yearly electricity disclosures- Release
- Latest refresh
- skipped
Schedule 10a interruption records
Commerce Commission data page for Schedule 10a interruption records- Release
- Latest refresh
- skipped
Worst-performing feeder disclosures
Commerce Commission data page for Worst-performing feeder disclosures- Release
- Latest refresh
- skipped
Asset management plan forecasts
Commerce Commission data page for Asset management plan forecasts- Release
- Latest refresh
- skipped
Zone substation disclosures
Commerce Commission data page for Zone substation disclosures- Release
- Latest refresh
- skipped
Regional solar installations snapshot
Electricity Authority data page for Regional solar installations snapshot- Release
- Latest refresh
- skipped
Monthly solar history
Electricity Authority data page for Monthly solar history- Release
- Latest refresh
- success
National electricity generation and consumption
Quarterly and annual GWh by fuel and sector. Imported from MBIE’s published workbook.
Ministry of Business, Innovation and Employment data page for National electricity generation and consumption- Licence
- CC BY 4.0
- Release
- No release date recorded
- Latest refresh
- No result recorded
Network reporting-region boundaries
Electricity Authority data page for Network reporting-region boundaries- Release
- Latest refresh
- Archived boundaries bundled with the site
Distributor details
Electricity Networks Aotearoa, Commerce Commission and distributors data page for Distributor details- Licence
- Publisher terms vary. No common licence verified.
- Release
- No release date recorded
- Latest refresh
- Source facts checked on 24 November 2026
Metric coverage
| Metric | Years covered | Years with data | Networks in latest year |
|---|---|---|---|
| Planned SAIDI (A, B, H) | 2013–2026 | 14 | 20 |
| Unplanned SAIDI (C, D, E, F, G) | 2013–2026 | 14 | 20 |
| Total SAIDI | 2008–2026 | 19 | 29 |
| Planned SAIFI (A, B, H) | 2013–2026 | 14 | 20 |
| Unplanned SAIFI (C, D, E, F, G) | 2013–2026 | 14 | 20 |
| Total SAIFI | 2008–2026 | 19 | 29 |
| Average duration of a customer interruption (CAIDI) | 2008–2026 | 19 | 29 |
| Total interruptions | 2008–2026 | 19 | 29 |
| Total capital expenditure (net of contributions) | 2013–2026 | 14 | 29 |
| Total operating expenditure | 2013–2026 | 14 | 29 |
| Average connection points | 2013–2026 | 14 | 29 |
| Total circuit length for supply | 2008–2026 | 19 | 29 |
| Average connection point density | 2013–2026 | 14 | 29 |
| Total energy delivered to connection points | 2008–2026 | 19 | 29 |
| Maximum coincident system demand | 2013–2026 | 14 | 29 |
| Closing regulatory asset base | 2013–2026 | 14 | 29 |
| Total regulatory income | 2008–2026 | 19 | 29 |
Metric definitions
ICP means installation control point, or electricity connection point.
Commerce Commission disclosure definitions and templates
- Planned SAIDI (A, B, H) (minutes per ICP)
- Sum planned interruptions initiated by Transpower (A), on the network (B), and caused by another distributor (H).
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
- Unplanned SAIDI (C, D, E, F, G) (minutes per ICP)
- Sum unplanned interruptions on the network (C), by Transpower (D), from the distributor’s generation (E), from other generation (F), and by another distributor (G).
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
- Total SAIDI (minutes per ICP)
- Use the disclosed total across interruption classes.
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
- Planned SAIFI (A, B, H) (interruptions per ICP)
- Sum planned interruptions initiated by Transpower (A), on the network (B), and caused by another distributor (H).
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
- Unplanned SAIFI (C, D, E, F, G) (interruptions per ICP)
- Sum unplanned interruptions on the network (C), by Transpower (D), from the distributor’s generation (E), from other generation (F), and by another distributor (G).
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions)
- Total SAIFI (interruptions per ICP)
- Use the disclosed total across interruption classes.
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
- Average duration of a customer interruption (CAIDI) (minutes per customer interruption)
- Divide total SAIDI (minutes per ICP) by total SAIFI (interruptions per ICP) where frequency is positive.
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
- Total interruptions (interruptions)
- Use the disclosed event count across all interruption classes.
- SCHEDULE 10: REPORT ON NETWORK RELIABILITY (10(i): Interruptions) · MP3: Price & Quality Measures
- Total capital expenditure (net of contributions) (NZ$ (nominal))
- Use the Schedule 6a(i) capital expenditure total after capital contributions have been deducted. Convert thousands of dollars to dollars.
- SCHEDULE 6a: REPORT ON CAPITAL EXPENDITURE FOR THE DISCLOSURE YEAR (6a(i): Expenditure on Assets)
- Total operating expenditure (NZ$ (nominal))
- Use the disclosed whole-network actual total and multiply the reported thousand dollars by 1,000.
- SCHEDULE 6b: REPORT ON OPERATIONAL EXPENDITURE FOR THE DISCLOSURE YEAR (6b(i): Operational Expenditure)
- Average connection points (ICPs)
- Multiply disclosed average connection point density by total circuit length for supply.
- SCHEDULE 1: ANALYTICAL RATIOS (1(iii): Service intensity measures) · SCHEDULE 9c: REPORT ON OVERHEAD LINES AND UNDERGROUND CABLES (9c: Overhead Lines and Underground Cables)
- Total circuit length for supply (km)
- Use the reported total overhead and underground circuit length for supply.
- SCHEDULE 9c: REPORT ON OVERHEAD LINES AND UNDERGROUND CABLES (9c: Overhead Lines and Underground Cables) · MP1: Network Information (Network Information)
- Average connection point density (ICPs/km)
- Use the disclosed average number of ICPs per kilometre of circuit for supply.
- SCHEDULE 1: ANALYTICAL RATIOS (1(iii): Service intensity measures)
- Total energy delivered to connection points (GWh)
- Use the disclosed electricity volume delivered to customer connection points.
- SCHEDULE 9e: REPORT ON NETWORK DEMAND (9e(ii): System Demand) · MP1: Network Information (Network Information)
- Maximum coincident system demand (MW)
- Use the disclosed maximum coincident demand across the system.
- SCHEDULE 9e: REPORT ON NETWORK DEMAND (9e(ii): System Demand)
- Closing regulatory asset base (NZ$ (nominal))
- Use the closing RAB for the disclosure year and convert thousands of dollars to dollars.
- SCHEDULE 4: REPORT ON VALUE OF THE REGULATORY ASSET BASE (ROLLED FORWARD) (4(i): Regulatory Asset Base Value (Rolled Forward))
- Total regulatory income (NZ$ (nominal))
- Use the reported total regulatory income and convert thousands of dollars to dollars.
- SCHEDULE 3: REPORT ON REGULATORY PROFIT (3(i): Regulatory Profit) · FS1: Regulatory Profit Statement (Regulatory Profit)