Top Energy
Key disclosure figures, reliability trends and investment for this electricity network.
All electricity networksSwitch to another network
Network details
- Island
- North Island
- Ownership
- Trust-owned
- Price-quality regulation
- Regulated
- Website
- Visit the network website
Source: Distributor details
Key facts
- Average connection points
- 34,643Rank 14 out of 29 · 2026
- Total circuit length for supply (km)
- 4,175Rank 14 out of 29 · 2026
- Maximum coincident system demand (MW)
- 72.5Rank 20 out of 29 · 2026
Source: Yearly electricity disclosures
Average time without power (SAIDI)
Loading chart…
Gaps indicate missing data.
View as table
The national line is weighted by connection points where both figures were reported.
Source: Yearly electricity disclosures
Average number of interruptions (SAIFI)
Loading chart…
Gaps indicate missing data.
View as table
The national line is weighted by connection points where both figures were reported.
Source: Yearly electricity disclosures
Capital and operating expenditure
Loading chart…
View as table
Source: Yearly electricity disclosures
Solar uptake
- Connections with solar
- 2,840
- Installed solar capacity (kW)
- 86,776.8
- Solar capacity per network connection (kW per ICP)
- 2.5
Connections with solar
Loading chart…
View as table
Installed solar capacity
Loading chart…
View as table
Sources: Regional solar installations snapshot · Monthly solar history · Yearly electricity disclosures. Snapshot published 24 November 2026. Monthly series archived 23 November 2026.
Zone substations
Each reported name appears once. Voltage entries are shown as supplied in the release.
View 22 reported names
Source: Zone substation disclosures
Recent disclosed interruptions
Historical records from Schedule 10a, shown in the local time reported by the distributor.
| Started | Feeder | Classification | Cause | Year ended 31 March |
|---|---|---|---|---|
| RANGITIHI | Planned | Planned interruption | 2026 | |
| TOWAI | Planned | Planned interruption | 2026 | |
| WAIMA | Unplanned | Third party interference | 2026 | |
| HEREKINO | Unplanned | Adverse environment | 2026 | |
| VICTORIA VALLEY | Unplanned | Defective equipment | 2026 | |
| WAIMA | Unplanned | Adverse weather | 2026 | |
| HOREKE | Unplanned | Vegetation | 2026 | |
| RANGITIHI | Unplanned | Adverse environment | 2026 | |
| ORURU | Unplanned | Adverse weather | 2026 | |
| PURERUA | Unplanned | Adverse weather | 2026 |
Worst-performing feeders
Year ended 31 March 2026. Ranks are as reported for each network or subnetwork.
Unplanned SAIDI
Unplanned SAIFI
Customer impact ratio
Planned analytics
Network forecasts
See projections for reliability, investment and demand with uncertainty ranges.
View pricing preview for Network forecastsPlanned versus actual spending
Compare what a network expected to spend in its asset management plan with what it later reported.
View pricing preview for Planned versus actual spendingOutage causes
See how reported interruption frequency and duration vary by cause.
View pricing preview for Outage causes